The 3rd floor was a fully finished space that was converted to 165 new, state of the art, office spaces that would house engineers and other professionals. Design requirements also incorporated environmentally responsible design features and maintained compliance with the LEED Gold credits previously achieved during original construction of the building. Pictured are renderings from the project that were generated by WALSH personnel using AutoDesk’s REVIT software.